Da Nang's trusted rental platform
Skip to main content

Peninsula Da Nang

Lô A2-1, đường Lê Văn Duyệt, phường Nại Hiên Đông, quận Sơn Trà, TP. Đà Nẵng

Developer: Công ty Cổ phần Tập đoàn Đông Đô (website cũng ghi Công ty TNHH Đông Đô Peninsula Đà Nẵng)

About the project

Peninsula Da Nang (legal name Han Riverfront Apartment Complex, formerly The Muse) sits on lot A2-1 Le Van Duyet Street, Nai Hien Dong, Son Tra. The 7,167.5 m² site has 44% coverage, 30 floors plus 3 basements and 941 units (164 one-bedroom, 749 two-bedroom, 28 three-bedroom); construction permit 04/GPXD dated 1 February 2024. CafeLand describes two towers, retail on levels 1–3 and a level-30 pool. It has not been handed over: the site targets June 2026; Viettimes (June 2026) reported floors 27–28 under construction, aiming for Q3 2026.

Highlights

  • Four frontages on the Han River
  • 30 floors + 3 basements, 941 units
  • Two towers; L1–3 retail, level-30 pool
  • Long-term red book

Unit types

1 bedroom

48.7–50.1 m²

2 bedrooms

62.7–96.3 m²

3 bedrooms

106.5–106.5 m²

Amenities

  • Level-30 swimming pool

  • Outdoor gym

  • On-site park

  • Podium retail

  • Café

  • 3 basement levels

Nearby places

  • Thuan Phuoc Bridge

  • Han River swing bridge

  • My Khe Beach

  • Da Nang International Airport

Rental policies

Management fee
Per the building management fee schedule (project not yet handed over).

Video & links

FAQ

Who is the developer of Peninsula Da Nang?

The developer is Dong Do Group JSC; peninsuladanang.com also names Dong Do Peninsula Da Nang Ltd.

What is the unit mix?

941 units: 164 one-bedroom, 749 two-bedroom and 28 three-bedroom (about 48.7–50.1 / 62.7–96.3 / 106.5 m²) on 7,167.5 m², 30 floors plus 3 basements.

Has the project been handed over?

Not yet. The site targets June 2026; Viettimes (June 2026) reported floors 27–28 under construction, aiming for Q3 2026.

What is the legal name of the project?

The legal name is the Han Riverfront Apartment Complex; it was formerly called The Muse. Construction permit 04/GPXD is dated 1 February 2024.

Available units

0 active listings

No rental units are currently available in this complex.